Screws into the joists.
Diy nail down wood floor.
When laying a wood floor on concrete you must use an underlayment.
Asphalt paper or red rosin paper over the sub floor lapped 2 4 at seams.
Face nail the entire first row and remember to keep the board lengths random.
If you are wanting to nail the floor like they did then you would need to put a wood subfloor down and then nail the floor to that.
Walk the floor to check for loose or squeaky spots in the subfloor.
Install them by simply laying them in their correct location and finish nailing them to the subfloor.
This installation method is identical to staple down only the fastener and fastening tool differ.
Nailing down hardwood floors is the most common installation method especially for solid flooring.
Some squeaking and crackling of the floor is normal when using the nail or staple down method and is not considered a defect.
Nail threshold or transition strips in place where the edge of the floor is exposed.
As with the floor planks use an awl to tap the nail heads down so they sit below the surface of the threshhold.
Pull all protruding nails.
With a nail down engineered hardwood floor follow the same subfloor preparation steps as above including underlayment and laying spacers around the room s perimeter to maintain the manufacturer s recommended expansion gap.
If the 1 1 2 in.
Concrete never truly dries and depending where you live it could be a real desaster.
Height change is too much consider laying a laminated wood floor instead.
It is important to face nail the first row because the pneumatic nail can t get down in there.
Do it yourself tips.
It will hit the wall and the force would push the wood against the baseboard which would lose the 3 8 expansion and contraction.
When using nail down installation it s important to know the first and last rows of flooring have to be.
Staple down 15 lb.
The process involves nailing the flooring directly to a wood subfloor.
Then nail the flooring planks with a standard flooring nailer see photo for details.
Nail down most common wood subfloor solid engineered floors only on grade or above grade less risk for sanding.
To tighten the subfloor drive 2 in.
Set the quarter round shoe moulding on a piece of paper to keep it just a hair above the floor.
With the help of a professional tool rental and my tips you too can install like a pro.
Remove the existing floor covering and pry up the underlayment with a pry bar leaving the subfloor intact.
It will add less than 3 4 in.
Nail it to the baseboard not to the floor or subfloor.
This is in response to emily fasio.
Use your miter saw to cut threshholds to the length of your doorway openings.